Plaça D. Ramón Martí de Vallada, 2017-2018

  • PEM: 53.358,32€
  • Client: Ajuntament de Vallada,
  • Contractor: OBRYTC, SA
  • Tipology: Public spaces in the historic center.
  • Scope: Plaça Ramón Martí

The intervention restores the access level in front of the BRL church, maintaining vehicle passage around its perimeter and organizing a tiered staircase to overcome the steep longitudinal slope. Exposed aggregate concrete is used to handle the complex geometries around this space, which is framed by two lime trees. The existing fountain is integrated into a new area with benches, from which people can view the entire complex or wait in the shade. Fast-growing mulberry trees create a shaded space for the benches, complementing the entrances to the church, chapel, and the adjacent garden.

18_VALLADA_RMARTÍ_espai00
18_VALLADA_RMARTÍ_espai01
18_VALLADA_RMARTÍ_pujada_01
18_VALLADA_RMARTÍ_accesscap_01
18_VALLADA_RMARTÍ_carrero_01
18_VALLADA_RMARTÍ_access_01
18_VALLADA_RMARTÍ_P_espai

Esta web utiliza cookies propias y de terceros para su correcto funcionamiento y para fines analíticos. Contiene enlaces a sitios web de terceros con políticas de privacidad ajenas que podrás aceptar o no cuando accedas a ellos. Al hacer clic en el botón Aceptar, acepta el uso de estas tecnologías y el procesamiento de tus datos para estos propósitos. Más información
Privacidad